Skip to main content

Test and manufacturing

Electronics Design Review Services

Independent review of schematics, PCB layouts, firmware and test results: before a release, after an unexplained failure or a failed EMC test, or when you take over a stalled project from another team. You receive findings with evidence, severity, the affected nets or components and recommended actions.

Quick answer

What we build
Independent reviews of schematics, PCB layouts, firmware and test results, before a release, after an unexplained failure or EMC failure, or when you take over a stalled project, with findings, evidence and recommended fixes. Taking over a stalled or failing project
Who it is for
Teams that want a second opinion before fabrication or certification, and founders or engineering leads taking over a project from another team.
Typical timeline
1–2 weeks
Typical cost
Quoted per project as a fixed-scope proposal. For typical ranges, see our hardware development cost benchmarks.

Every project is quoted as a fixed-scope proposal within 3–5 business days of a discovery call. Discuss your product

Capabilities

What we deliver

Design analysis

Comprehensive review of circuit design, component selection, and system architecture for optimal performance.

Performance evaluation

Detailed assessment of system performance, power efficiency, and reliability metrics.

Optimization recommendations

Expert suggestions for improving design efficiency, reducing costs, and enhancing reliability.

Design validation

Thorough validation of design against requirements, standards, and best practices.

Performance testing

Simulation and testing of critical parameters to verify design performance.

Risk assessment

Identification and analysis of potential design risks and failure modes.

Capabilities and deliverables

Analysis areas

  • Circuit and system architecture
  • Component selection and sourcing
  • Design rules and standards compliance

Deliverables

  • Detailed analysis report
  • Risk mitigation strategies
  • Optimization recommendations

Project rescue

Taking over a stalled or failing project

When a previous vendor has gone quiet, a board keeps failing or firmware arrives without documentation, the takeover starts with a design audit: what exists, what works and what can be kept, before any fix or redesign is recommended.

What can you take over?
Schematics and PCB layouts in Altium Designer, KiCad, OrCAD/Allegro, PADS or legacy EAGLE files, firmware repositories, BOMs, test records and certification reports. We start from the files and revision you actually have.
What does the audit produce?
Findings with evidence, severity, the affected nets or components and recommended actions, plus which parts of the design can be kept. The review itself typically takes 1–2 weeks, depending on the size of the design package.
Will you insist on a full redesign?
No. Where the findings allow it, the fix is a targeted change to the layout, components or firmware, handled as an engineering change with regression tests. A redesign is recommended only when the existing design cannot meet the requirement.
EMC failures before certification
Pre-compliance scans to locate the emission or immunity problem, changes to grounding, filtering, layout or shielding, and a retest before you rebook the accredited laboratory.
Field failures and returns
Root-cause analysis of failed units, symptoms and test logs against the affected population, then a corrective change released with traceability to the product revision.
Undocumented or unstable firmware
A reproducible build and a written description of how the device behaves on the target board come first; then the code is stabilised, documented and extended, including recovery from a failed OTA update.

Process

How we work

  1. Define the question

    Set the review boundary: release readiness, an unexplained failure, EMC risk or a proposed redesign.

    Deliverable: Agreed review scope

  2. Collect the inputs

    Source schematics and layout, BOM, stackup, design rules, requirements and any test results.

    Deliverable: Review package

  3. Review

    Review the design against the agreed question.

    Deliverable: Findings with evidence, severity, affected nets or components and recommended actions

  4. Follow-up

    Fixes, simulations, laboratory measurements and a follow-up review, where included in the scope.

    Deliverable: Updated design or follow-up review

Planning

Scope and cost

Start with a non-confidential summary of your product and the milestone you need to reach next.

What to include in an electronics design review brief

An independent schematic or PCB review needs a defined question: release readiness, an unexplained failure, EMC risk or a proposed redesign. Set the review boundary so the resulting findings can guide the next engineering decision.

Inputs for your project brief

  • Source schematics and layout, BOM, stackup, design rules and mechanical constraints.
  • Product requirements, target markets, planned production volume and known test failures.
  • Board revision, measured waveforms or logs, test setup and the decision the review must support.

Choose the scope for your next milestone

Agree the deliverables and acceptance criteria

Request findings with evidence, severity, affected nets or components and recommended next actions. Agree whether fixes, simulations, laboratory measurements and a follow-up review are included. A document review cannot establish performance that requires testing on physical hardware.

Agree confidentiality arrangements before sharing proprietary design files.

Planning guides

Rescuing a Stalled Hardware Project

Warning signs, the files to demand from a previous vendor, how a design audit works, EMC and field-failure triage, and typical audit cost.

Proof

Related case studies

Review all case studies

FAQ

Frequently asked questions

Working with Rapid Circuitry

How much does a project cost, and how is pricing structured?

Each project is quoted as a fixed-scope proposal: a statement of work with milestones, deliverables and pricing, sent within 3–5 business days of the discovery call. The price depends on the requirements, how mature the design is, technical complexity, the number of prototype iterations and the validation scope. Longer engagements can also run as a retainer or a hybrid of both. For budgeting before you contact us, our hardware development cost benchmarks and the PCB design, firmware and IoT cost guides give indicative ranges with their assumptions stated. They are planning ranges, not quotes.

How long does a project take?

It depends on the scope and on what already exists when we start. As planning ranges from our cost benchmarks: a single PCB layout takes 2–6 weeks per board and embedded firmware 4–16 weeks. A connected (IoT) product takes 3–12 months from concept to a production-ready design, and a regulated medical device 12–24 months to a 510(k) submission-ready package; from idea to mass production, a typical connected product takes 9–18 months. The proposal sets out a dated milestone plan, and you receive weekly progress updates during the project.

Who owns the intellectual property?

You do. Our contracts assign the intellectual property in the project work product (schematics, PCB design files, firmware source code and documentation) to you on payment, and we hand over the source files, not only fabrication outputs or compiled binaries. The exact terms are set out in the signed agreement for each engagement.

Do you sign NDAs?

Yes. We sign a mutual NDA before any technical discussion of your project. Send your standard NDA or use ours; we return it signed within one business day.

Can you work with clients in the US, Europe and Japan?

Yes. We are based in Hyderabad, India, and work with product teams in India, the United States, the United Kingdom, Germany, Japan, Australia, the Middle East and other markets. Our office hours are 10:30–19:00 India Standard Time (UTC+5:30), Monday to Saturday, and we schedule design reviews across time zones, typically from US Pacific to Central European time. Japan is 3.5 hours ahead of India, so our first four hours overlap the Japanese afternoon. Prototypes and documentation ship by international courier such as DHL or FedEx. Our hardware outsourcing guide covers what to agree before an international project starts.

Do you hand off to manufacturing, and which contract manufacturers do you work with?

Yes. We prepare the manufacturing release package — fabrication and assembly drawings, the BOM with approved manufacturers, programming files and test specifications — and hand it over to the contract manufacturer (EMS) you choose. If you have not chosen one, we help you evaluate candidates through technical capability assessments and a pilot build. See manufacturing support.

Are you ISO 9001 or ISO 13485 certified?

No. Rapid Circuitry does not hold ISO 9001, ISO 13485 or other certificates. Our processes are aligned with ISO 9001:2015, and we design products to the requirements of the standards that apply to them — for example IEC 60601-1 and IEC 62304 for medical devices (with design documentation structured so your ISO 13485 quality system can absorb it) and IEC 61000 for EMC — and we specify IPC-A-610 workmanship classes for assembly. We prepare the product and its documentation for certification testing at accredited laboratories; the certificate or approval is issued for your product by the laboratory, notified body or regulator.

What do you need from me to start?

A short, non-confidential description of the product and what it must do (sensors, connectivity, on-device processing), the target production volume and unit cost, the markets and regulations it must meet (for example FDA, CE or FCC), your timeline, and what already exists: a concept, a proof of concept, schematics, PCB files or firmware. After the NDA, the next step is a 30-minute discovery call with the engineers who would work on the project, followed by the fixed-scope proposal. Send a project brief to begin.

Explore

PCB design

Schematic capture and layout up to 24 layers, including HDI, rigid-flex, RF and high-speed boards, with a DFM-checked fabrication package.

Electronics design

Precision analog, mixed-signal and power circuits: sensor front ends, power supplies and battery management.

Embedded hardware development

System architecture, MCU/SoC selection, schematic and PCB design, board bring-up, validation and manufacturing handoff.