Medical Wearable
Remote Patient Monitoring Device for Cardiac Care
- Class B Firmware Design
- IEC 62304
- VEB Sensitivity (ANSI/AAMI EC57)
- 99.2%
- Design target
- Battery Life
- 14 Days
- Design target
Test and manufacturing
Pre-compliance EMC/EMI, radio and environmental testing during development, design fixes when a product fails, and test plans and documentation for the accredited laboratory that performs formal FCC, CE, BIS or sector testing. Pre-compliance reduces the risk of a failed formal test; it does not certify the product.
Every project is quoted as a fixed-scope proposal within 3–5 business days of a discovery call. Discuss your product
Medical Wearable
Remote Patient Monitoring Device for Cardiac Care
Standards
Capabilities
Conducted and radiated emissions and immunity pre-scans during development, at accredited partner labs, so problems are found before the formal test.
Guidance through CE and FCC certification and RoHS/REACH declarations, and for India BIS CRS, WPC ETA and TEC MTCTE registration support, with documentation for the test laboratory.
Early-stage testing to identify and resolve potential compliance issues before formal certification.
Radio pre-compliance for FCC, RED and ETSI requirements: output power, spurious emissions and coexistence checks before the accredited lab test.
Map the product against the applicable safety, EMC and radio standards and prepare the test plan for the accredited laboratory.
Temperature, humidity and vibration pre-testing against the product's environmental requirements.
Process
EMC/EMI, RF emissions and environmental pre-compliance testing to identify design risks before formal assessment.
Deliverable: Test results and risk assessment
Mitigate the risks found and retest; pre-compliance does not itself grant certification or regulatory approval.
Deliverable: Design changes and retest results
Documentation, reporting and regulatory submission assistance alongside the accredited laboratory.
Deliverable: Documentation and test reports
Planning
Start with a non-confidential summary of your product and the milestone you need to reach next.
EU and US market access: CE under RED with EN 18031 cybersecurity, the Cyber Resilience Act timeline, FCC Part 15 and IEC 62368-1 safety.
Which Indian approvals an electronic product needs — BIS CRS, WPC ETA, TEC MTCTE, CDSCO, AIS-156 — plus timelines and the Make in India schemes.
Plain-English explainers of IEC 62304, ISO 13485, ISO 26262 and IEC 60601 — what they require and who needs them.
Proof
Medical Wearable
US-based digital health startup
Multi-Connectivity Pet Tracker
European pet technology company
Smart Urinometer
Medical device manufacturer, India
Automated Nitric Oxide Therapy System
Medical equipment manufacturer, India
AI-Powered Oxygen Therapy
Medical equipment manufacturer, India
FAQ
Timelines vary by certification and product complexity. Pre-compliance testing: 1-2 weeks. CE marking: 4-8 weeks for simple products, 12-16 weeks for complex devices. FCC certification: 2-6 weeks. FDA 510(k) review: typically 3-6 months after submission (the FDA's goal is 90 review days); a 510(k) is a clearance, not a certification. ISO 26262 functional-safety assessment runs alongside the development programme rather than as a final test. Our pre-compliance approach and design-for-compliance methodology accelerates the process by identifying issues early.
EMC compliance testing costs vary widely depending on product complexity, applicable standards, and the number of test configurations required, but a full FCC or CE certification campaign at an accredited lab typically costs $5,000 to $30,000, depending on the radios and target markets. Pre-compliance scans typically cost $1,000 to $5,000 and reduce the risk of costly failures during formal testing.
We design products to, and prepare them for testing against: CE marking (EU), including the EMC Directive and, for radios, RED; FCC Part 15/18 (USA); ISED (Canada); RCM (Australia); UKCA (UK); BIS CRS, WPC ETA and TEC MTCTE (India); IEC 61000 and CISPR 32 for EMC; IEC 62368-1 (IT/AV equipment) and IEC 60601-1/-1-2 (medical) for safety and EMC; RoHS/REACH declarations; and ATEX/IECEx via a notified body. For medical and automotive programmes we also prepare design evidence for ISO 13485, IEC 62304, ISO 26262 and IEC 61508 assessments. Pre-scans and formal testing are carried out at accredited partner labs, which issue the reports and certificates. Rapid Circuitry itself holds no certificates.
Pre-compliance testing is performed at accredited partner labs during development to identify potential issues early. It's faster and more cost-effective for iterative testing. Formal compliance testing is conducted at accredited test houses and generates official certification reports for regulatory submissions. Pre-compliance testing finds problems while they are still cheap to fix, which reduces the risk of failing and repeating formal tests.
Standard EMC testing includes conducted emissions (150kHz-30MHz), radiated emissions (30MHz-6GHz), conducted immunity (surges, EFT/burst), radiated immunity (80MHz-6GHz), ESD immunity per IEC 61000-4-2 (typically ±4 kV contact/±8 kV air for residential products, ±8 kV/±15 kV for medical per IEC 60601-1-2), power quality (harmonics, flicker), and specific tests for wireless devices. We also perform specialized tests like automotive EMC per CISPR 25, industrial immunity per IEC 61000-4, and medical EMC per IEC 60601-1-2.
Yes, design-for-compliance is integral to our service. Recommendations include PCB layout optimization (grounding, shielding, trace routing), component selection (EMI filters, ferrites, capacitors), enclosure design (shielding effectiveness, aperture management), cable and connector selection, and power supply filtering. We use pre-compliance testing to validate improvements iteratively, improving your design's chances in formal certification. Only an accredited test laboratory or certification body can confirm compliance.
Complete certification packages include test reports from accredited labs, technical construction files with schematics and BOMs, EMC test reports with margin analysis, declaration of conformity, risk assessments and hazard analyses, user manuals and safety instructions, and compliance matrices mapping requirements to verification. For medical devices, we provide design history file inputs and 510(k) submission support. Documentation is prepared to the requirements of the target regulator; acceptance is decided by the lab, notified body or regulator.
Harmonised IEC/CISPR test methods and the IECEE CB Scheme let one safety test report support national safety approvals, and mutual recognition agreements (MRAs) let a recognised laboratory test for several markets. EMC and radio reports still have to be issued against each market's rules (FCC Part 15, EN/ETSI, MIC in Japan, KC in South Korea), which often means extra configurations or test cases rather than a full retest.
Wireless devices require radio-specific certifications beyond standard EMC approvals, including FCC Part 15 Subpart C/E for unlicensed radios (Parts 22/24/27 for cellular) in the US, RED radio testing in the EU, ISED RSS standards in Canada and WPC ETA in India, along with protocol-level certifications from bodies like the Wi-Fi Alliance and Bluetooth SIG. Cellular devices additionally require carrier-specific testing programs such as PTCRB or GCF certification and network operator acceptance testing.
Highly Accelerated Life Testing (HALT) subjects products to progressively extreme thermal cycling, vibration, and combined stresses during development to uncover design weaknesses and expand reliability margins. Highly Accelerated Stress Screening (HASS) applies a production-level subset of those stresses to every manufactured unit to detect latent defects before shipment. While not mandated by a specific regulatory standard, HALT and HASS are industry best practices for aerospace, automotive, industrial, and medical products.
Electronic medical devices must meet IEC 60601-1 for electrical safety and IEC 60601-1-2 for electromagnetic compatibility, with significantly stricter immunity limits than commercial EMC standards to ensure patient safety in clinical environments. Additional requirements include biocompatibility testing (ISO 10993), software validation under IEC 62304, and risk management documentation per ISO 14971, all of which feed into FDA 510(k) or EU MDR approval submissions.
Comprehensive compliance testing identifies electromagnetic interference issues, safety hazards, and environmental vulnerabilities before products reach the market, directly reducing the risk of field failures that trigger regulatory recalls. Testing across the full range of operating conditions catches edge-case failures that limited prototype testing often misses, and a recall or a failed market-surveillance check usually costs far more than the testing that would have found the problem.
Each project is quoted as a fixed-scope proposal: a statement of work with milestones, deliverables and pricing, sent within 3–5 business days of the discovery call. The price depends on the requirements, how mature the design is, technical complexity, the number of prototype iterations and the validation scope. Longer engagements can also run as a retainer or a hybrid of both. For budgeting before you contact us, our hardware development cost benchmarks and the PCB design, firmware and IoT cost guides give indicative ranges with their assumptions stated. They are planning ranges, not quotes.
It depends on the scope and on what already exists when we start. As planning ranges from our cost benchmarks: a single PCB layout takes 2–6 weeks per board and embedded firmware 4–16 weeks. A connected (IoT) product takes 3–12 months from concept to a production-ready design, and a regulated medical device 12–24 months to a 510(k) submission-ready package; from idea to mass production, a typical connected product takes 9–18 months. The proposal sets out a dated milestone plan, and you receive weekly progress updates during the project.
You do. Our contracts assign the intellectual property in the project work product (schematics, PCB design files, firmware source code and documentation) to you on payment, and we hand over the source files, not only fabrication outputs or compiled binaries. The exact terms are set out in the signed agreement for each engagement.
Yes. We sign a mutual NDA before any technical discussion of your project. Send your standard NDA or use ours; we return it signed within one business day.
Yes. We are based in Hyderabad, India, and work with product teams in India, the United States, the United Kingdom, Germany, Japan, Australia, the Middle East and other markets. Our office hours are 10:30–19:00 India Standard Time (UTC+5:30), Monday to Saturday, and we schedule design reviews across time zones, typically from US Pacific to Central European time. Japan is 3.5 hours ahead of India, so our first four hours overlap the Japanese afternoon. Prototypes and documentation ship by international courier such as DHL or FedEx. Our hardware outsourcing guide covers what to agree before an international project starts.
Yes. We prepare the manufacturing release package — fabrication and assembly drawings, the BOM with approved manufacturers, programming files and test specifications — and hand it over to the contract manufacturer (EMS) you choose. If you have not chosen one, we help you evaluate candidates through technical capability assessments and a pilot build. See manufacturing support.
No. Rapid Circuitry does not hold ISO 9001, ISO 13485 or other certificates. Our processes are aligned with ISO 9001:2015, and we design products to the requirements of the standards that apply to them — for example IEC 60601-1 and IEC 62304 for medical devices (with design documentation structured so your ISO 13485 quality system can absorb it) and IEC 61000 for EMC — and we specify IPC-A-610 workmanship classes for assembly. We prepare the product and its documentation for certification testing at accredited laboratories; the certificate or approval is issued for your product by the laboratory, notified body or regulator.
A short, non-confidential description of the product and what it must do (sensors, connectivity, on-device processing), the target production volume and unit cost, the markets and regulations it must meet (for example FDA, CE or FCC), your timeline, and what already exists: a concept, a proof of concept, schematics, PCB files or firmware. After the NDA, the next step is a 30-minute discovery call with the engineers who would work on the project, followed by the fixed-scope proposal. Send a project brief to begin.
Explore
Schematic capture and layout up to 24 layers, including HDI, rigid-flex, RF and high-speed boards, with a DFM-checked fabrication package.
DFM/DFA review, release packages, test strategy and pilot-build support for the move to a contract manufacturer.
Precision analog, mixed-signal and power circuits: sensor front ends, power supplies and battery management.