Skip to main content

Services

Electronic Product Design & Development Services

Hardware, firmware, PCB, cloud, and manufacturing support organized around the stage and technical risk of your product.

Core hardware

6 services

PCB design

Schematic capture and layout up to 24 layers, including HDI, rigid-flex, RF and high-speed boards, with a DFM-checked fabrication package.

2–6 weeks per board

Typical timeline
2–6 weeks per board
  • HDI, rigid-flex and high-speed layout
  • Controlled impedance and signal-integrity checks
  • DFM-checked fabrication package
  • Altium Designer
  • KiCad
  • Cadence Allegro/OrCAD

Embedded hardware development

System architecture, MCU/SoC selection, schematic and PCB design, board bring-up, validation and manufacturing handoff.

3–18 months

Typical timeline
3–18 months
  • Custom PCB design and layout
  • Hardware prototyping
  • Component selection and optimization
  • ARM Cortex-M/A and RISC-V
  • Altium Designer
  • KiCad

Electronics design

Precision analog, mixed-signal and power circuits: sensor front ends, power supplies and battery management.

4–12 weeks

Typical timeline
4–12 weeks
  • Low-noise sensor front ends
  • Power supplies and battery management
  • EMC design and pre-compliance
  • Precision analog
  • Mixed-signal
  • Power electronics

Firmware development

Embedded C/C++ firmware on bare metal, an RTOS or embedded Linux: drivers, bring-up, secure boot and OTA updates.

4–16 weeks

Typical timeline
4–16 weeks
  • Board bring-up, BSPs and drivers
  • Bare-metal, RTOS or embedded Linux
  • Secure boot and OTA updates
  • C/C++
  • FreeRTOS
  • Zephyr

IoT solutions

Connected products from one team: sensor hardware, firmware, BLE, LoRaWAN or cellular connectivity, OTA updates and the cloud backend.

3–12 months

Typical timeline
3–12 months
  • Hardware, firmware and cloud from one team
  • BLE, LoRaWAN, Wi-Fi or cellular
  • Secure provisioning and OTA
  • MQTT/CoAP
  • LoRaWAN
  • NB-IoT/LTE-M

Prototyping

Standard prototype boards up to 8 layers, fabricated and assembled through partner PCB fabs in 48–72 hours; complex multilayer, HDI or RF boards typically take 5–7 business days.

48–72 hours (standard boards)

Typical timeline
48–72 hours (standard boards)
  • Partner-fab fabrication and assembly
  • Firmware bring-up
  • Functional and pre-compliance testing
  • 3D printing
  • PCB assembly
  • Functional testing

Specialised engineering

4 services

FPGA development

RTL design, verification and timing closure for DSP, high-speed interfaces and edge-AI acceleration on AMD, Altera and Lattice FPGAs.

8–20 weeks

Typical timeline
8–20 weeks
  • RTL in VHDL, Verilog or SystemVerilog
  • Verification and timing closure
  • High-speed interfaces and DSP
  • VHDL
  • Verilog
  • SystemVerilog

RF design

Antennas and RF front ends from sub-GHz to about 8 GHz, integrated and pre-scanned before radio certification.

6–12 weeks

Typical timeline
6–12 weeks
  • Custom antennas and matching networks
  • Cellular, GNSS, Wi-Fi, BLE and LoRa integration
  • Radio pre-compliance support
  • Antenna design
  • RF front ends
  • Sub-GHz to ~8 GHz

Power electronics

BMS, GaN and SiC DC-DC converters, 48 V and 800 V systems, EV charging electronics and motor drives.

Scoped per project

Typical timeline
Scoped per project
  • BMS hardware and firmware
  • GaN and SiC DC-DC converters
  • 48 V and 800 V architectures
  • GaN and SiC
  • CAN / CAN FD
  • FOC motor control

Edge AI solutions

On-device inference: feasibility on your target hardware, model porting and quantisation, and integration with the firmware.

8–16 weeks

Typical timeline
8–16 weeks
  • Feasibility on your target hardware
  • Model porting and quantisation
  • Integration with hardware and firmware
  • LiteRT (TensorFlow Lite)
  • ONNX Runtime
  • OpenVINO

Wearables, vehicles and robotics

3 services

Wearable devices

Low-power, sealed wearables with ECG, PPG and SpO2 sensing, Bluetooth LE and companion-app SDKs.

8–16 weeks to prototype

Typical timeline
8–16 weeks to prototype
  • Miniaturised, sealed (IP67/IP68) electronics
  • ECG, PPG and SpO2 sensing
  • Low-power Bluetooth LE
  • Bluetooth LE/NFC
  • ECG, PPG, SpO2
  • Sensor fusion

Connected vehicles

Telematics control units, V2X modules, in-vehicle networking and secure OTA for connected vehicles.

12–24 weeks

Typical timeline
12–24 weeks
  • Telematics control units
  • V2X and in-vehicle networking
  • Secure OTA updates
  • CAN
  • 4G/5G
  • GNSS

Robotics solutions

Robot control electronics and software: motor control, ROS 2 integration, sensor fusion and functional-safety design.

12–24 weeks

Typical timeline
12–24 weeks
  • Motor-control electronics
  • ROS 2 integration
  • Functional-safety design
  • ROS 2/MoveIt
  • PyTorch/TensorFlow
  • Computer vision

Test and manufacturing

4 services

Design review

Independent design reviews and audits, including takeover of stalled or failing projects.

1–2 weeks

Typical timeline
1–2 weeks
  • Schematic, layout and firmware review
  • Findings with evidence and fixes
  • Takeover of stalled projects
  • Schematic review
  • Layout review
  • DFM analysis

Compliance testing

Pre-compliance testing and certification support for electronic products — this helps identify design risks before formal assessment; it does not itself grant certification or regulatory approval.

1–16 weeks

Typical timeline
1–16 weeks
  • EMC, radio and environmental pre-scans
  • Design fixes after a failed test
  • Test plans and lab submission support
  • Pre-compliance EMC scans
  • Test plans
  • Accredited partner labs

Manufacturing support

DFM/DFA review, release packages, test strategy and pilot-build support for the move to a contract manufacturer.

Ongoing

Typical timeline
Ongoing
  • DFM and DFA review
  • Fabrication and assembly packages
  • Pilot-build support
  • DFM/DFA review
  • Test strategy and fixtures
  • Release packages

Production support

Manufacturing and production support for electronic products — NPI, DFM/DFA and production-readiness through ramp.

Ongoing

Typical timeline
Ongoing
  • Yield and root-cause analysis
  • Production test fixtures
  • Obsolescence and cost-down redesign
  • Python/LabVIEW test executives
  • Boundary scan (JTAG)
  • SPC and Pareto analysis

Software and cloud

4 services

Software development

Device APIs, provisioning, telemetry pipelines and companion-app backends for connected hardware.

8–16 weeks

Typical timeline
8–16 weeks
  • Device APIs and provisioning
  • Telemetry pipelines
  • Companion-app backends
  • Python
  • Java
  • C#/.NET

Web development

Real-time IoT dashboards, fleet portals and customer web apps for connected products.

6–12 weeks

Typical timeline
6–12 weeks
  • Real-time telemetry views
  • Fleet and device admin portals
  • Accessibility (WCAG 2.2 AA)
  • React
  • Next.js
  • TypeScript

Mobile app development

iOS, Android and cross-platform companion apps: BLE or Wi-Fi onboarding, device control, alerts and OTA update flows.

8–16 weeks

Typical timeline
8–16 weeks
  • BLE or Wi-Fi device onboarding
  • Offline behaviour and alerts
  • OTA update workflows
  • React Native
  • Flutter
  • Swift

Cloud & backend development

Device-to-cloud backends: provisioning, MQTT and API ingestion, time-series data, OTA coordination and fleet monitoring.

6–12 weeks

Typical timeline
6–12 weeks
  • Device provisioning and identity
  • MQTT and API ingestion
  • Fleet monitoring and dashboards
  • AWS/Azure/GCP
  • MQTT ingestion
  • REST/GraphQL APIs

Case studies

Proof from delivered projects

Review all case studies