Electronics Sustaining Engineering & Production Support

Support electronics after launch with yield analysis, production test fixtures, root-cause investigation, field-failure correction, component obsolescence response, cost-down redesign and lifecycle management. This service begins once a product is already in production.

Quick answer

What we build
Engineering support for products already in production: yield analysis, production test fixtures, root-cause investigation, field-failure correction, component obsolescence, cost-down redesign and lifecycle management.
Who it is for
Companies with a product in production that has a yield, field-return, obsolescence or cost problem.
Typical timeline
Ongoing
Typical cost
Quoted per project as a fixed-scope proposal. For typical ranges, see our hardware development cost benchmarks.
Tools and technologies
Python/LabVIEW test executives, Boundary scan (JTAG), SPC and Pareto analysis

Every project is quoted as a fixed-scope proposal within 3–5 business days of a discovery call. Discuss your product

Capabilities

What we deliver

Yield analysis

Pareto analysis of AOI, ICT and functional-test failures against a defined denominator, with targeted fixes to the design, stencil, profile or test.

Root-cause and field-failure analysis

Failed units, symptoms and test logs analysed against the affected population, then a corrective change released with traceability to the product revision.

Obsolescence response

Qualified alternates for end-of-life or unavailable parts, last-time-buy assessments and the layout or firmware changes a substitution needs.

Cost-down redesign

BOM, layer-count, panel and test-time reductions assessed for their electrical, mechanical, firmware and compliance impact before release.

Production test fixtures

Bed-of-nails and functional test jigs with Python or LabVIEW test executives, parametric logging and pass/fail limits agreed with your contract manufacturer.

ECO and regression release

Each change handled as an engineering change order with regression tests, so the production release stays traceable.

Capabilities and deliverables

Process management

  • Production workflow optimization
  • Statistical process control
  • Quality assurance protocols

Technical support

  • Manufacturing liaison services
  • Documentation and reporting
  • Compliance impact review of each change

Process

How we work

  1. Baseline

    Start from a reproducible problem and a traceable product revision; agree the baseline and measurement window.

    Deliverable: Agreed baseline for yield, cost or failure rate

  2. Root cause

    Analyse failure symptoms, test logs and failed units against the affected population.

    Deliverable: Root-cause evidence

  3. Change and regression

    Treat each change as an engineering change and assess its electrical, mechanical, firmware and compliance impact.

    Deliverable: Approved changes with regression results

  4. Release

    Release the change with traceability to the product revision.

    Deliverable: Traceable production release

Planning

Scope and cost

Start with a non-confidential summary of your product and the milestone you need to reach next.

What to include in a sustaining engineering brief

Production support begins with a reproducible problem and a traceable product revision. Yield improvement, component obsolescence, BOM cost reduction and field-failure analysis need different evidence and acceptance measures.

Inputs for your project brief

  • Product revisions, firmware builds, BOM and supplier change or obsolescence notices.
  • Failure symptoms, affected quantity and total population, test logs and available failed units.
  • Target cost or yield, production schedule, approved change process and retest requirements.

Choose the scope for your next milestone

Agree the deliverables and acceptance criteria

Agree a baseline and measurement window before judging a yield or cost improvement. Document root-cause evidence, approved changes, regression results and release traceability. Treat a component substitution as an engineering change with electrical, mechanical, firmware and compliance impacts to assess.

Agree confidentiality arrangements before sharing proprietary design files.

Planning guides

Hardware Product Development Roadmap

Idea to mass production in six stages — feasibility, prototype, EVT, DVT, PVT and ramp — with durations, cost ranges, founder decisions, IP terms and pilot runs.

FAQ

Frequently asked questions

Working with Rapid Circuitry

How much does a project cost, and how is pricing structured?

Each project is quoted as a fixed-scope proposal: a statement of work with milestones, deliverables and pricing, sent within 3–5 business days of the discovery call. The price depends on the requirements, how mature the design is, technical complexity, the number of prototype iterations and the validation scope. Longer engagements can also run as a retainer or a hybrid of both. For budgeting before you contact us, our hardware development cost benchmarks and the PCB design, firmware and IoT cost guides give indicative ranges with their assumptions stated. They are planning ranges, not quotes.

How long does a project take?

It depends on the scope and on what already exists when we start. As planning ranges from our cost benchmarks: a single PCB layout takes 2–6 weeks per board and embedded firmware 4–16 weeks. A connected (IoT) product takes 3–12 months from concept to a production-ready design, and a regulated medical device 12–24 months to a 510(k) submission-ready package; from idea to mass production, a typical connected product takes 9–18 months. The proposal sets out a dated milestone plan, and you receive weekly progress updates during the project.

Who owns the intellectual property?

You do. Our contracts assign the intellectual property in the project work product (schematics, PCB design files, firmware source code and documentation) to you on payment, and we hand over the source files, not only fabrication outputs or compiled binaries. The exact terms are set out in the signed agreement for each engagement.

Do you sign NDAs?

Yes. We sign a mutual NDA before any technical discussion of your project. Send your standard NDA or use ours; we return it signed within one business day.

Can you work with clients in the US, Europe and Japan?

Yes. We are based in Hyderabad, India, and work with product teams in India, the United States, the United Kingdom, Germany, Japan, Australia, the Middle East and other markets. Our office hours are 10:30–19:00 India Standard Time (UTC+5:30), Monday to Saturday, and we schedule design reviews across time zones, typically from US Pacific to Central European time. Japan is 3.5 hours ahead of India, so our first four hours overlap the Japanese afternoon. Prototypes and documentation ship by international courier such as DHL or FedEx. Our hardware outsourcing guide covers what to agree before an international project starts.

Do you hand off to manufacturing, and which contract manufacturers do you work with?

Yes. We prepare the manufacturing release package — fabrication and assembly drawings, the BOM with approved manufacturers, programming files and test specifications — and hand it over to the contract manufacturer (EMS) you choose. If you have not chosen one, we help you evaluate candidates through technical capability assessments and a pilot build. See manufacturing support.

Are you ISO 9001 or ISO 13485 certified?

No. Rapid Circuitry does not hold ISO 9001, ISO 13485 or other certificates. Our processes are aligned with ISO 9001:2015, and we design products to the requirements of the standards that apply to them — for example IEC 60601-1 and IEC 62304 for medical devices (with design documentation structured so your ISO 13485 quality system can absorb it) and IEC 61000 for EMC — and we specify IPC-A-610 workmanship classes for assembly. We prepare the product and its documentation for certification testing at accredited laboratories; the certificate or approval is issued for your product by the laboratory, notified body or regulator.

What do you need from me to start?

A short, non-confidential description of the product and what it must do (sensors, connectivity, on-device processing), the target production volume and unit cost, the markets and regulations it must meet (for example FDA, CE or FCC), your timeline, and what already exists: a concept, a proof of concept, schematics, PCB files or firmware. After the NDA, the next step is a 30-minute discovery call with the engineers who would work on the project, followed by the fixed-scope proposal. Send a project brief to begin.

Explore

Manufacturing support

DFM/DFA review, release packages, test strategy and pilot-build support for the move to a contract manufacturer.

PCB design

Schematic capture and layout up to 24 layers, including HDI, rigid-flex, RF and high-speed boards, with a DFM-checked fabrication package.

Compliance testing

Pre-compliance testing and certification support for electronic products — this helps identify design risks before formal assessment; it does not itself grant certification or regulatory approval.